Endura Manufacturing Co. Ltd. TEL 1-800-661-9930
Endura’s one-day Oilfield Tank Lining System.
This product has been tested and is recommended exclusively for 200 bbl and 400 bbl oilfield storage tanks. Used unde r normal operating conditions this coating system will provide excellent long term performance.
Suitability Product Features
Endura Oilfield Tank Lining system is for use in 200 and 400 bbl tanks used
storage. Service temperature dry: 200ºC/360ºF.
Surface Preparation
It is recommended that all steel and other ferrous surfaces be sandblasted or
mechanical y sanded with 80 grit sand paper. Surface must be cleaned all contaminants
Mixing Ratio
1 part by volume of component B [FUB0108]
The recommended temperature when mixed is 20-25°C (68-77°F).
Theoretical Solids Content: Environmental Conditions
For optimum coating performance product, substrate and ambient temper
Shelf Life*
between 20°C-25°C* (68°F-77°F). To prevent condensation during applicati
surface temperature must be 3°C (5°F) or more above the dew point at all
*for use outside this range please contact your Endura representative.
Spraying Viscosity Pot Life of Mixed Product: Spray Gun Setup
Endura Manufacturing Co. Ltd. is committed to ongoing product development to provide the best products. New materials, production methods and design refinements are introduced into existing products without notice. For this reason, any current Endura product may differ in some respect from its published description. It is always warranted to equal or exceed the original design specifications, unless otherwise stated.
Endura Manufacturing Co. Ltd. TEL 1-800-661-9930
Oilfield Tank Lining Endura’s one-day Oilfield Tank Lining System. This product has been tested and is recommended exclusively for 200 bbl and 400 bbl oilfield storage tanks. Used under normal operating conditions this coating system will provide excellent long term performance.
Application Method Product Features
- Tank should be well ventilated during and after application.
Recommended Film Build Thickness and Cover Rate
Endura Oilfield Tank Lining Coating has a recommended film build thickness of 8.0-15.0
Theoretical coverage at 1.0 mil (25 microns) DFT: 1056 ft² per gallon @ 100% transfer
efficiency. (Approximately 15 gallons per 400 bbl tank).
Drying Time* Theoretical Solids Content:
* Subject to ambient conditions and good air movement.
Shelf Life* Component A: (1) year Specifications Pot Life of Mixed Product:
For VOC amounts please refer to the product MSDS
Endura high strength gun wash, Endura epoxy reducer or Endura EX-2C thinner.
All applicators will require certification and training. Training will be provided by an
authorized representative of Endura Manufacturing Co. Ltd.
This coating system is NOT recommended for acid tanks (HcL) which require product specific linings.
Endura Manufacturing Co. Ltd. is committed to ongoing product development to provide the best products. New materials, production methods and design refinements are introduced into existing products without notice. For this reason, any current Endura product may differ in some respect from its published description. It is always warranted to equal or exceed the original design specifications, unless otherwise stated.
Dr. Woods Knee Surgery Discharge Instructions WOUND CARE There may be a slight bruising along the wound with discoloration. This bruising may also move down into your calf ankle and foot. There may be a small amount of drainage from the incision area. ___ Keep dressing clean, dry and in place until follow up appointment. ___ Remove dressing: ___ days, ___ physical therapy will remov
Saturday, August 21, 2004 1:00p.m. – 5:00p.m. Session 1: Inflammation and Atherosclerosis “Innate Immunity in Atherosclerosis” Linda K. Curtiss, Ph.D. The Scripps Research Institute La Jolla, CA “Auto Antibody Responses in Atherosclerosis” Joseph L. Witztum, M.D. University of California San Diego, CA “The Unfolded Protein Response as a Mediator of Death and